Unità documentaria JM-AIY/OttomanRegisters/Vol3/p4a/item21 - Sewage system works unfinished in Bethlehem’s Old City as Christmas approaches, 5 December 1894 (Gregorian calendar) - 23 Tishrîn Thânî 1310 (Ottoman fiscal calendar (Rumi)

Area dell'identificazione

Codice di riferimento

JM-AIY/OttomanRegisters/Vol3/p4a/item21

Titolo

Sewage system works unfinished in Bethlehem’s Old City as Christmas approaches, 5 December 1894 (Gregorian calendar) - 23 Tishrîn Thânî 1310 (Ottoman fiscal calendar (Rumi)

Date

  • 1894-12-05 (Creazione)

Livello di descrizione

Unità documentaria

Consistenza e supporto

1 item

Area del contesto

Nome del soggetto produttore

Istituto conservatore

Storia archivistica

Modalità di acquisizione

Area del contenuto e della struttura

Ambito e contenuto

After examining this response and reviewing [all] related papers, it has become clear that both contractors mentioned [above] have failed to finish the sewage drains (laghm) in question. And in accordance with their authorization given by our council dated on the 15th of Tishrîn 'Awwal (1)309, a verification from our council of elders was given on the 20th of Tishrîn Thânî (1)309, stating that it is urgent to finish these sewage drains with the knowledge of the [municipal] engineer in accordance with the Request of the directorate of the Old City (qasaba) of Bethlehem. Given the delay in the sewage drains work, the whole stoppage of passage and the approach of Christmas during which the patriarchs come to the Old City. Given the heavy rain, it is also necessary to avoid the complaint of the residents and the ruin of the properties next to the sewage drains caused by the contractors who dug the sewage drains and left them without construction. Drawing on all this, and in accordance with the order of his Excellency the local governor (mutasarref) = = =, it has been decided by the council to authorize one of us, the respectable Tâhir Effendi. So, he has found that ten meters of the sewage drains built by the contractors were destroyed, and because of that a house of a woman --- was [partially] damaged. [Thus, it has been observed] that because of contractors' work and the plenty of rains and floods, all of the sand (?) that assigned for the work was pulled away. And with his knowledge [i. e. Tâhir Effendi] it has been decided to finish all what is needed on the expense of the contractors and to spend the amount of one thousand and eight hundred piasters that was claimed. So it has been decided to confirm what was recommended by the council and if there is something [left] to say to the contractors, they can direct to the court. In order to announce these directions to them, this decision was taken on the 23rd of Tishrîn Thânî 1(310).
[5 signatures]

Valutazione e scarto

Incrementi

Sistema di ordinamento

Area delle condizioni di accesso e uso

Condizioni di accesso

Condizioni di riproduzione

Lingua dei materiali

  • arabo

Scrittura dei materiali

    Note sulla lingua e sulla scrittura

    Caratteristiche materiali e requisiti tecnici

    Strumenti di ricerca

    Area dei materiali collegati

    Esistenza e localizzazione degli originali

    Esistenza e localizzazione di copie

    Unità di descrizione collegate

    Descrizioni collegate

    Area delle note

    Identificatori alternativi

    Punti di accesso

    Punti d'accesso per soggetto

    Punti d'accesso per luogo

    Punti d'accesso per nome

    Punti d'accesso relativi al genere

    Area di controllo della descrizione

    Codice identificativo della descrizione

    Codice identificativo dell'istitituto conservatore

    Norme e convenzioni utilizzate

    Stato

    Livello di completezza

    Date di creazione, revisione, cancellazione

    Lingue

      Scritture

        Fonti

        Area dell'acquisizione